List of Contributions

Contact Details

Institute Ribbons and Badges

Contact information, job title, education, and license are populated by the ASCE Membership database. You can edit your account here. Please allow 12 hours for the changes to appear in ASCE Collaborate. 

Brian Stone, P.E.


Contributions

1 to 2 of 2 total
Posted By Brian Stone 04-12-2016 09:10 AM
Found In Egroup: Environment, Coasts, Oceans, & Infrastructure
\ view thread
To all, In response to your questions; 1. Water will flow to Tank # 2 if the inlet to Tank # 2 is lower than the elevation at the proposed connection to the pipe from Tank #1. There will be a flow to Tank # 2 if the hydraulic grade is above ground level (a full pipe) at the connection location. ...
Posted By Brian Stone 04-12-2016 05:36 AM
Found In Egroup: Environment, Coasts, Oceans, & Infrastructure
\ view thread
To All, I am pleased to help. 1. Water will flow to Tank # 2 if the inlet to Tank 2 is lower than the elevation of the proposed connection to the existing pipe from Tank # 1. I presume that the hydraulic grade is positive (the pipe flows full) at the proposed location of the connection to the existing ...