|
Alan, It appears as though there may be guides on the upstream wingwall. Are weir boards installed? Raising the effective invert at this location could exclude some of the larger material during high streamflows. ------------------------------ James Kapla P.E., M.ASCE Seattle, WA --------- ...
|