List of Contributions

Contact Details

Indicator Engineering PLLC

Ribbons

Badges

Mr. Patrick Flanagan, P.E., M.ASCE

Indicator Engineering PLLC

Contributions

1 to 1 of 1 total
Posted By Patrick Flanagan 05-12-2017 09:46 AM
Found In Egroup: Environment, Coasts, Oceans, & Infrastructure
\ view thread
In general, for a 1-D RAS model you should limit lateral weirs to upstream or downstream of the bridge/culvert cross-sections. In 4.1 and earlier, RAS would pop up with an error if the geometry had a lateral structure and internal structure overlapping. That error is curiously gone in version 5.0.3. ...