We are in the process of revising our city's Drainage Criteria Manual. I have developed a simplified scheme for designing LID capture volume to account for hydrological changes to a developed site.
If anyone is interested, I would appreciate some input on the validity of this thought process.
Thank You
-------------------------------------------
Roy Vestal
City Engineer
City of Siloam Springs
Siloam Springs AR
(479)313-1408(479)313-1408 -------------------------------------------