Skip main navigation (Press Enter).
Log in
Toggle navigation
Collaborate Home
Communities
My Communities
All Communities
Communities of Practice
Get Started
New User
My Profile
My Privacy Settings
My Email Preferences
FAQs
Browse
Announcements
Blogs
Discussion Posts
Glossary
Library Entries
Connect
Directory
Events
Volunteer
Member Home (Admin)
Log in
New Login Experience Coming!
ASCE will launch a new login experience in early 2026.
List of Contributions
×
Contact Details
×
Enter Password
Enter Password
Confirm Password
Ribbons
Badges
Mr. Christian Parker, P.E., M.ASCE
Profile
Connections
Contacts
Contributions
Achievements
List of Contributions
Contributions
1 to 5 of 38 total
search criteria =
ALL
RE: Scaling of RSA Results to Match ELF Base Shear for Towers with Podiums/Basements (ASCE 7)
Posted By
Christian Parker
10-27-2025 11:46 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Mahmoud, Is there something in ASCE 7 that drives the requirement to scale at top of podium? My interpretation is that scaling is intended to be at the base of the structure, not intermediate levels. I do feel that the mass of a podium can contribute to story shears above in real life, although the ...
RE: If you See Something, Say Something
Posted By
Christian Parker
04-04-2024 10:36 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Mitch, I found the article very insightful, but I wonder if we're asking too much of a public numb to visible damage in a field where the difference between critical issues and cosmetic damage is not obvious. I love explaining lateral-torsional buckling because it's so intuitive once you can picture ...
RE: Seismic resistance in precast slab and beam connections comparison with conventional slab and beam connection
Posted By
Christian Parker
04-01-2024 08:06 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Hello Shreyans, Can you clarify what you are asking? I'm not seeing a question in your post. ------------------------------ Christian Parker P.E., M.ASCE Structural Project Engineer Chicago IL ------------------------------
RE: The building is affected by the wind and earthquake at the same time.
Posted By
Christian Parker
02-26-2024 11:13 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
I had just entered practice when this thought first occurred to me, and I remember being alarmed and getting very curious. I eventually concluded that this is not cause for concern. If we assume no correlation between wind and seismic (more on that later), the probability of a 700-year design wind ...
RE: Factor of Safety for Net Uplift Tension in Buildings
Posted By
Christian Parker
01-24-2024 10:17 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
I think in the instance of ballasted solar arrays, using D+0.6W vs. 0.6D+0.6W makes a significant difference, since the design output is the required amount of dead load rather than member strength. You'll specify 40% less ballast if you design for 0.6D+0.6W. I certainly see your point on geotech. ...
«
1
2
3
4
5
...
»
Copyright 2025. All rights reserved.
Powered by Higher Logic
×
Community Tags
Add a tag
x
User Tags may not contain the following characters: @ # $ & :