Skip main navigation (Press Enter).
Log in
Toggle navigation
Collaborate Home
Communities
My Communities
All Communities
Communities of Practice
Get Started
New User
My Profile
My Privacy Settings
My Email Preferences
FAQs
Browse
Announcements
Blogs
Discussion Posts
Glossary
Library Entries
Connect
Directory
Events
Volunteer
Member Home (Admin)
Log in
New Login Experience Coming!
ASCE will launch a new login experience in early 2026.
List of Contributions
×
Contact Details
Kiewit
×
Enter Password
Enter Password
Confirm Password
Ribbons
Badges
Mr. Brian Grom
Kiewit
Profile
Connections
Contacts
Contributions
Achievements
List of Contributions
Contributions
1 to 2 of 2 total
search criteria =
ALL
RE: Tub Girder Deck Panels
Posted By
Brian Grom
04-30-2018 02:58 PM
Found In
Egroup:
Horizontal/Subsurface Infrastructure & Transportation
\
view thread
This is a one-off requirement that we have never seen and the DOT is not even entertaining options outside of being able to inspect the completed bridge deck from inside the tub girder with no lost deck forms in place. The forms must be removed, anything in place not an option. With our limited options ...
Tub Girder Deck Panels
Posted By
Brian Grom
04-26-2018 10:27 AM
Found In
Egroup:
Horizontal/Subsurface Infrastructure & Transportation
\
view thread
I have a unique scenario on a tub girder bridge deck, the decking material must be removed for inspection of the deck from inside of the tub girders. The access to the tub girders are small hatches (less than 3'x2') at either end of a 1200' total span. Gaps in the deck to remove materials is being explored ...
Copyright 2025. All rights reserved.
Powered by Higher Logic
×
Community Tags
Add a tag
x
User Tags may not contain the following characters: @ # $ & :