List of Contributions

Contact Details

Institute Ribbons and Badges

Contact information, job title, education, and license are populated by the ASCE Membership database. You can edit your account here. Please allow 12 hours for the changes to appear in ASCE Collaborate. 

Mr. John Levitt, P.E., M.ASCE


Contributions

1 to 2 of 2 total
Posted By John Levitt 10-31-2017 05:03 PM
Found In Egroup: Horizontal/Subsurface Infrastructure & Transportation
\ view thread
​Since the 'black cotton soil needs to be dispose of' (I' assuming you mean excavated and removed). I would excavate and remove the 'black cotton soil' first as that would lower your overall depth of excavation for your utilities. Install the utilities, backfilling and compacting the trenches as required. ...
Posted By John Levitt 09-19-2017 10:30 AM
Found In Egroup: Horizontal/Subsurface Infrastructure & Transportation
\ view thread
​Take a look at recycled concrete aggregate. ------------------------------ John Levitt P.E., M.ASCE Associate Grapevine TX ------------------------------