I do not know pavement structure? How old is pavement?
Cobble stone pavement placed in flat profile. Pavement is very permeable and will saturate aggregate base, subgrade..). Drainage is big issue on this project very flat and boxed in. Subgrade failure might be the cause of
cobble stones dislodging and rutting occurred on wheel paths and cobble stone between got shoved.
i believe site investigation remove cobble stone will reveal pavement structure (BASE, SUBGRADE), if rutting occurred in subgrade or base and may be perform DCP and I will do same thing on section that is performing very well for comparison.
Corrective action: undercut (use geotextile fabric, #57 aggregate or similar and choke it with aggregate base 1" minus or similar) and day lighted. Preventive maintenance it looks like there is no clearance issue to raise grade, may be place 2 layers of asphalt (one leveling course and one surface course with 2% and crown in middle to shed water).
Thanks for the opportunity to comment.
------------------------------
Mourad Bouhajja P.E., M.ASCE
Marketing/Technical Manager
Oldcastle Materials
Midlothian, VA
(804) 516-3804
------------------------------
Original Message:
Sent: 03-20-2017 03:41
From: Kiran Kumar D P
Subject: Highway Destress
Hello Every One!
The Picture attached shows the distress occurred in the pavement constructed using cobble stone for the Collector Road.
As seen the distress was occurred along the line having 1 meter from the edge of the carriageway.
Please Any one identify the cause and reason for such failure.
Thank You
------------------------------
Kiran Kumar D P Aff.M.ASCE
Bangalore
919663 742414
------------------------------