Hi Karen,
We have been able to successfully use ICPR 4 in larger watersheds up to about 5 SM that were both urbanized and undeveloped. Our experience with large urbanized watersheds has found that calibrating the model stability parameters can be challenging if a lot of negligible storage elements are present in the model, such as zero-storage nodes representing drainage manholes and catch basins. However, the challenge is not insurmountable.
If you are able to generate a high-quality DEM to import into the project, then the stage-area and cross-section takeoff tools can save a lot of time in the model development stage.
Cameron Houmann P.E.
Senior Registered Engineer
Donald W. McIntosh Associates, Inc.
Winter Park, FL
------------------------------
Cameron Houmann P.E., M.ASCE
Project Engineer
Altamonte Springs FL
------------------------------