I'm learning that my risk definition considering two factors – probability of event occurrence and consequences of event – is too narrow.
For example, EPA defines environmental risk as having three components – 1. How much of a stressor is present, 2. How much contact (exposure) an ecological receptor has, and 3. How it affects the health of receptor.
Further, Brooks et al.* really opened my eyes when they defined risk for permafrost damage to highways as consisting of the product of seven parameters regarding danger – two (temporal and spatial) for credibility and two for exposure, and one each for probability, severity, and cost.
These examples suggest that we should refer to engineering risk as a Risk Tensor, Rn, where n≥2 is the tensor rank.
Your thoughts?
* Conceptual Design of Quantitative Risk Algorithms for a Geohazard and Geo-asset Management System for Roadway Networks in Permafrost Regions, Heather Brooks, Lukas Arenson, Khatereh Roghangar, Jan Stirling, and Frank Hung, 2004, in Quantative Risk Algorithms, 9th International Conference on Control and Robotics Engineering.
------------------------------
William McAnally Ph.D., P.E., BC.CE, BC.NE, F.ASCE
ENGINEER
Columbus MS
------------------------------
Original Message:
Sent: 03-07-2025 10:24 AM
From: William McAnally
Subject: Risk Defined
Risk in the context of civil engineering is defined as comprising two distinct components: the probability of an event occurring and the magnitude of the consequences resulting from that event. This definition highlights that risk is not merely about the likelihood of adverse events, but also about the potential impact of those events. Managing risk effectively involves awareness of these factors and making informed design and regulatory decisions to mitigate potential issues.
------------------------------
William McAnally Ph.D., P.E., BC.CE, BC.NE, F.ASCE
ENGINEER
Columbus MS
------------------------------