List of Contributions

Contact Details

Tucson Electric Power

Institute Ribbons and Badges

Contact information, job title, education, and license are populated by the ASCE Membership database. You can edit your account here. Please allow 12 hours for the changes to appear in ASCE Collaborate. 

Kirk Uchytil, P.E., M.ASCE

Tucson Electric Power

Contributions

1 to 1 of 1 total
Posted By Kirk Uchytil 03-08-2018 10:31 AM
Found In Egroup: Integrated Buildings & Structures
\ view thread
Joshua, often times the type of shear wall method depends on the layout of the wall, such as if windows are present. I am an engineer who has never used the perforated method, so I can't compare it to the other methods. If the shear wall has no windows, I typically use the segmented method. If windows ...