List of Contributions

Contact Details

T. Williamson - Timber Engineeering

Ribbons

Badges

Thomas Williamson, P.E., F.SEI, F.ASCE

T. Williamson - Timber Engineeering

Contributions

1 to 1 of 1 total
Posted By Thomas Williamson 03-08-2018 06:07 PM
Found In Egroup: Integrated Buildings & Structures
\ view thread
As has been mentioned when there are a minimum number of openings in the wall the segmented approach works very well. But it is important to note that a hold down is required on each side of each segment and these can be expensive to install. For a wall having 2 openings 6 hold downs will be needed. ...