Skip main navigation (Press Enter).
Log in
Toggle navigation
Collaborate Home
Communities
My Communities
All Communities
Communities of Practice
Get Started
New User
My Profile
My Privacy Settings
My Email Preferences
FAQs
Browse
Announcements
Blogs
Discussion Posts
Glossary
Library Entries
Connect
Directory
Events
Volunteer
Member Home (Admin)
Log in
New Login Experience Coming!
ASCE will launch a new login experience in early 2026.
List of Contributions
×
Contact Details
Asia-Pacific Engrs
×
Enter Password
Enter Password
Confirm Password
Ribbons
Badges
Ian Simpson, P.E., M.ASCE
Asia-Pacific Engrs
Profile
Connections
Contacts
Contributions
Achievements
List of Contributions
Contributions
1 to 2 of 2 total
search criteria =
ALL
RE: Base plate connection
Posted By
Ian Simpson
01-18-2018 09:34 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Regarding my previous suggestion of adding a plate above that existing, hopefully there is enough HD bolt projection to allow full engagement of the nut if the overall plate thickness is increased? Of course the HD bolts and anchorage into the footing would also need re-evaluation. Best regards ...
RE: Base plate connection
Posted By
Ian Simpson
01-18-2018 09:34 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Easy fix may be to fit plates 11" by 7 1/4" by (say)1 1/4" thick, with appropriate drilled hole, each side of the web of the column. Drilled to match existing hole, chamfer lower side of plates to clear existing welds. Then weld new plate all round with 8mm weld. Could be done in situ but protect 2" ...
Copyright 2025. All rights reserved.
Powered by Higher Logic
×
Community Tags
Add a tag
x
User Tags may not contain the following characters: @ # $ & :