Skip main navigation (Press Enter).
Log in
Toggle navigation
Collaborate Home
Communities
My Communities
All Communities
Communities of Practice
Get Started
New User
My Profile
My Privacy Settings
My Email Preferences
FAQs
Browse
Announcements
Blogs
Discussion Posts
Glossary
Library Entries
Connect
Directory
Events
Volunteer
Member Home (Admin)
Log in
New Login Experience Coming!
ASCE will launch a new login experience in early 2026.
List of Contributions
×
Contact Details
×
Enter Password
Enter Password
Confirm Password
Ribbons
Badges
Mr. Richard Lenz, P.E., M.ASCE
Profile
Connections
Contacts
Contributions
Achievements
List of Contributions
Contributions
1 to 5 of 6 total
search criteria =
ALL
RE: Failure on Paper
Posted By
Richard Lenz
09-18-2019 10:03 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
I have been retired now for more than 10 years. Ever since I started in the engineering business, working mostly on industrial and general building projects, the design effort has always included iterations and changes as it proceeded, mostly resulting from the necessary coordination with the other design ...
RE: Building extension project
Posted By
Richard Lenz
07-05-2019 10:38 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
I wrote this assuming that the addition was to the side. If on top, these comments do not apply. ------------------------------ Richard Lenz LM, ASCE, Retired West Chester OH (513) 777-5525 ------------------------------
RE: Building extension project
Posted By
Richard Lenz
07-04-2019 07:25 PM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Consider designing the building addition (project extension) such that very little load (if any) is carried by the existing structure. This can be accomplished using cantilevers in the framing, and grade beams cantilevering over new footings. Footings should be located far enough away that they do not ...
RE: Hurricane wind on structures
Posted By
Richard Lenz
06-23-2019 07:35 PM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Hurricane design wind speed is a lot more than 90 mph. Anyway, 60 mps equates to 135 mph, more like a hurricane wind speed, although certainly not the highest. Not sure how you got to 3600 mph, other than there are 3600 seconds in an hour. Also, with the way the weather is changing (along with climate ...
RE: Spall Repair of Control Joints in Floor Slab
Posted By
Richard Lenz
10-19-2018 11:21 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
The spalling is likely due to lack of an adequate joint filler when originally constructed. Sawed control joints should be filled after the slabs have cured and before being put into use, especially with hard-wheeled trucks. Now retired, I am not up-to-speed on the latest materials. Years ago we spec'd ...
«