Skip main navigation (Press Enter).
Log in
Toggle navigation
Collaborate Home
Communities
My Communities
All Communities
Communities of Practice
Get Started
New User
My Profile
My Privacy Settings
My Email Preferences
FAQs
Browse
Announcements
Blogs
Discussion Posts
Glossary
Library Entries
Connect
Directory
Events
Volunteer
Member Home (Admin)
Log in
New Login Experience Coming!
ASCE will launch a new login experience in early 2026.
List of Contributions
×
Contact Details
Siemens Limited, India
×
Enter Password
Enter Password
Confirm Password
Ribbons
Badges
Mr. Neeraj Agrawal, M.ASCE
Siemens Limited, India
Profile
Connections
Contacts
Contributions
Achievements
List of Contributions
Contributions
1 to 5 of 8 total
search criteria =
ALL
RE: What structural technical topics do we struggle with most?
Posted By
Neeraj Agrawal
12-17-2020 09:12 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
You may also add in your list : seismic ductile detailing aspects for industrial structures like long span pipe racks (box girders over columns) and long span trussed- portal frames with cranes (portal frame with stepped column). Thanks. Neeraj Agrawal ------------------------------ ...
RE: Anchor Bolt Design with respect to Petrochemical Facilities
Posted By
Neeraj Agrawal
06-26-2020 01:58 PM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Yes now there is also a German code DIN EN 1992-4: 2019 dedicated to anchors in concrete ------------------------------ Neeraj Agrawal Gurgaon India ------------------------------
RE: Anchor Bolt Design with respect to Petrochemical Facilities
Posted By
Neeraj Agrawal
06-26-2020 06:58 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Yes, code explicitly does not mention that in lieu of pry out check, reinforcement may be provided but my interpretation is that once I ignore breakout and provide reinforcement close to base plate, pry out can also be ignored since pry out is the result of bolt's tendency to rotate due to shear forces ...
RE: Anchor Bolt Design with respect to Petrochemical Facilities
Posted By
Neeraj Agrawal
06-25-2020 09:03 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
I think you are referring to very old version of ACI 318. ACI 318-2019 version gives following information which may be useful to you: Pryout failure of cast in anchors longer than 65mm is double of tension breakout failure (Cl 17.7.3). Tension breakout failure capacity of anchor group Ncbg may be found ...
RE: Seismic coefficient for non-building structures
Posted By
Neeraj Agrawal
09-26-2019 11:47 PM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
ASCE 7 does not cover this type of system. However, AISC 341 does specify a method to design knee braced systems. Please refer to Commentary of E1 in AISC 341-10 or AISC 341-16. You will find guidelines to design your system. In summary, you should consider R =3.5 or 2.5 (from Table 15.4-1, ASCE 7-10, ...
«
1
2
»
Copyright 2025. All rights reserved.
Powered by Higher Logic
×
Community Tags
Add a tag
x
User Tags may not contain the following characters: @ # $ & :