Skip main navigation (Press Enter).
Log in
Toggle navigation
Collaborate Home
Communities
My Communities
All Communities
Communities of Practice
Get Started
New User
My Profile
My Privacy Settings
My Email Preferences
FAQs
Browse
Announcements
Blogs
Discussion Posts
Glossary
Library Entries
Connect
Directory
Events
Volunteer
Member Home (Admin)
Log in
Â
New Login Experience Coming!
ASCE will launch a new login experience in early 2026.Â
List of Contributions
×
Contact Details
ICM - Ingenieria Civil Montajes
×
Enter Password
Enter Password
Confirm Password
Ribbons
Badges
Eng. Napoleon De La Colina, Ing., M.ASCE
ICM - Ingenieria Civil Montajes
Profile
Connections
Contacts
Contributions
Achievements
List of Contributions
Contributions
1 to 4 of 4 total
search criteria =
ALL
RE: Visible slab reinforcement - suggestions?
Posted By
Napoleon De La Colina
11-22-2019 05:48 PM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Indeed that formwork is inadequate. I fully agree with James, chipping or sandblasting the soffit plus a bonding agent before shotcreting will do the job. ------------------------------ Napoleon De La Colina Ing., A.M.ASCE Eng Mgr ICM - Ingenieria Civil Montajes LIMA ------------------------ ...
RE: Epoxy Set Anchor Bolts
Posted By
Napoleon De La Colina
10-30-2019 11:45 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
I also agree with that and also checking with the manufacturer. In that way the owner's engineer would have nothing more to say. ------------------------------ Napoleon De La Colina Ing., A.M.ASCE Eng Mgr ICM - Ingenieria Civil Montajes LIMA ------------------------------
RE: Overcoming Challenges To Infusing Ethics Into the Development of Engineers
Posted By
Napoleon De La Colina
07-13-2017 10:25 AM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Thank you William for bringing up this point. I have extracted few sentences and will put them on the notice board of the office. No doubt all codes and rules set (including the ten commandments) are meant to help us to do good, but the role of the educator -the boss, the mentor, is to "give reasons ...
RE: ETABS p-delta analysis
Posted By
Napoleon De La Colina
06-27-2017 12:31 PM
Found In
Egroup:
Integrated Buildings & Structures
\
view thread
Berhan, ETABS requires you to define one load combination (one at a time for each analysis) that best represents the conditions of your analysis. Since you are interested in analysing the second order effects due to lateral loading of the seven Load combinations offered by ASCE7 (LRDF), those containing ...
Copyright 2025. All rights reserved.
Powered by Higher Logic
×
Community Tags
Add a tag
x
User Tags may not contain the following characters: @ # $ & :