Hello Everyone,
We all are familiar with the IS Code. As per IS code
M 20= 1:1.5:3 and M 25= 1:1:2. This design is never preferred on sites.
I would like to know more about mix designs taken in consideration for M 20 and M 25.
Please share the mix design of it with the minimum cement content. Also you also have options of adding the mineral and chemical admixtures.
Mineral admixtures like GGBS and Flyash
Chemical admixture like plasticizers.
Lets do it.
------------------------------
Ahmed Abubakar Jariwala BCE, S.M.ASCE
Engineer
Surat
------------------------------