I came across Risk Informed Decision Making while doing an informal survey of risk management practices in civil engineering. With a background in the oil and gas industry, I assumed this type of approach was fairly common place, but apparently it is not. I have subsequently found reference to its application in dam safety, the nuclear industry, and NASA and I'm curious where else it is being used.
I also came across ASCE Policy 569 - Risk Informed Design and wonder based on the content, if this is about Risk Informed Decision Making. I hope that somebody responsible for the policy's authorship might be able to shed more light on the policy and its intent.
------------------------------
Mitch Winkler P.E.(inactive), M.ASCE
Houston, TX
------------------------------