I have found that non-governmental clients are flexible on that clause. Most of my contracts do not have an indemnification clause as part of the contract. The indemnification clause makes the relationship between client and engineer adversarial, and as engineers, we cannot afford to have that kind of poison in our relationships with our clients. I have found that governmental clients force you to use their contract, and because of that, and their requirement for us to insure everyone and their brother on the construction site, my fees are adjusted upward with governmental agencies.
The other clause I dislike that governmental agencies make us use is the "time and materials not to exceed." I add a significant amount to the estimate of fees when they make us use this clause because they make the engineering company assume all the risk for a poorly defined project. I was given a project that was originally written in 1996 that included the time and materials not to exceed clause. A newly elected member of congress decided that they did not like the project, even though when they were a city councilmember they forced the City to do it, and as of 2015, the job was still being done by my previous engineering company. They were about $3 million over budget on a $500,000 initial engineering job because of a "Time and Material not to Exceed" clause. They were paid for all the extra study work, but the actual base engineering work that the studies caused was not paid. It didn't help that the hourly wages for the basic engineering were 1996 levels, and were paying EITs $18/hour, and project principals $43/hour.
------------------------------
Dwayne Culp, Ph.D., P.E., P.Eng, M.ASCE
Culp Engineering, LLC
Rosenberg TX
(713)898-1977
------------------------------