Discussion: View Thread

The passage of time in my first high-rise structural design project

  • 1.  The passage of time in my first high-rise structural design project

    Posted 09-23-2020 11:00 AM
    Edited by Tirza Austin 09-23-2020 10:59 AM

    A project with specifications , 20 floors on the ground with an area of approximately 25,000 square meters in a special position for a precise employer, I was full of stress whether I could finish my work successfully. I did a lot of hard work several times modeling, optimization and special controls and ...., I was so focused on my work even in my dreams, I was also involved in designing its structure. It's been 11 years since it was designed, people live in it, sometimes I pass in front of the project, nothing is more enjoyable than seeing the results of your efforts in your first high-level project.

    What was your first design project? Please share your experience in this thread.

    Structural Desinger 2009



    ------------------------------
    [Reza] [Mokarramaydenlou] Ph.D., C.Eng, P.E., S.E., M.ASCE
    [Structural Engineering and Seismic rehabilitation Consultant ]
    ------------------------------